In continuation of the Nigeria Railway Modernization project, the construction firm handling it shall be closing the Adegbola level crossing which is popularly known as Ajayi Farm level crossing to vehicular traffic flow from 8pm today Wednesday, 11th November to 7am tomorrow on Thursday, 12th November, 2020.
Therefore, Motorists coming from Bolade-Oshodi with the intention of accessing Ikeja Inside or Oba Akran through the Ajayi Farm Railway level crossing should enter the GRA at Adekunle-Fajuyi/GRA Railway level crossing and connect Oba Akinjobi Way then link Oba Akran area.
Motorists from Ikeja Inside under the bridge needs not to go through the Local Government area and Ajibola Street as the Railway level crossing will be closed to traffic for the said railway lines track laying.